Day 2 - In the Big Brother House Lock-down
Well, Corona Virus has turned out to the virus that just keeps giving, its lockdown but the garage has been tested and is clear so evening entertainment is sorted.
The Perch bracket has been started boring the main hole and facing the recess for the thrust washer, next is to fly-cut the smokebox curve.
Made a start on the chimney base casting. Just rough turning of the flange for further machining from this datum after. Not easy to position and get running true, went with a tapped bracket held in the chuck and bolted on from the front. This will be for security on the majority of the turning and last little bit in the center just machines slow with its gripped by just the 2 jaws.
Comments
Post a Comment